Kinsley is currently providing site work at 101 York Road for the new 15-story student apartment building with two stories of underground parking. The project scope includes:
- Mass grading, including the export of approximately 35,000 yards of dirt to create the 20-ft-deep, two-story underground parking structure.
- A new storm water management system, including new piping, a plunge pool and a vault.
- New utilities and tying in to existing Baltimore County water and sewer lines. We’ll avoid service interruptions by installing a dog house manhole for the sewer tie-in, and an 8-inch meter vault will be utilized for the water service. As building construction progresses out of excavation, the proposed on-site water and sewer will follow the backfill of the exterior walls to the desired elevations.
- Excavation for the foundation footings.
- Site concrete, including curb, gutter, sidewalks and paving.
Project:101 York Road Site Work
Architect:Moseley Architects