The Kinsley highway and bridge team replaced a 62-year-old bridge over the stream of Winters Run. The bridge superstructure consists of a concrete deck placed over four, 30-inch by 36-inch, precast, pre-stressed, concrete box beams. The bridge substructure consists of reinforced concrete abutments with footings founded on micropiles.
The project included the following:
Bridge Replacement
Highway & Bridge
Transportation
Forest Hill, MD
Harford County
Greenman-Pederson, Inc.
53 feet by 30 feet